Domestic alumina production totaled 352,255 tonnes in Q3 2025, down 3.2% from Q2 but 2.0% higher YoY, as the industry’s two active refineries operated at an average rate of 37.8% capacity.
The decline was led by the Jamalco refinery (operating at 77% capacity), which recorded a quarterly decrease of 3.2% to 270,269 tonnes, though output remained 8.1% above Q3 2024. Windalco’s production (52.8% of capacity) fell 3.3% to 81,986 tonnes, marking an even sharper 14.1% YoY decrease as the plant experienced some mechanical and logistical setbacks during the review period.
YTD alumina output aggregated to ~1.10 million tonnes, down 2.1% compared to the corresponding period in 2024, as operational challenges and capacity constraints offset early gains.
Alumina Production (mt)
| COMPANY | Q2 2025 | Q3 2025 | % Change Q3 vs Q2 | Q3 2024 | % Change 2025/2024 | OP RATE Q3 2025 |
|---|---|---|---|---|---|---|
| Windalco | 84,783 | 81,986 | -3.3% | 95,452 | -14.1% | 52.8% |
| Jamalco | 279,192 | 270,269 | -3.2% | 249,923 | 8.1% | 77.4% |
| Alpart | 0 | 0 | 0.0% | 0 | 0.0% | 0.0% |
| Total | 363,975 | 352,255 | -3.2% | 345,375 | 2.0% | 37.8% |
| YTD FIGURES | 1,099,517 | 1,123,395 | -2.1% | 39.8% |